132kV Grid Connection

Locations: Dartford, UK

project brief

The client required the design, installation, and commissioning of a new 132kV electrical supply system to support energy recovery operations in Belvedere, Dartford.

key project deliverables

  • Special Engineering Difficulties (SED) included constrained bridge crossings requiring Horizontal Directional Drilling (HDD) beneath roads
  • Potential for flooding due to the river’s tidal nature necessitated placing the pipe bridge above the bridge soffit and within the protection of the Thames Estuary flood defenses. Polytetrafluoroethylene (PTFE) sliding bearings and expansion joints were used to accommodate thermal and structural movement without compromising flood resilience

Project Categories

Energy