80MVA 132/11kV Data Centre Connection, Dagenham

JSM were appointed as Principal Contractor to deliver a new dual 132kV ducted cable and fibre installation system as part of the Design and Build of a dual 80MVA Connection into the DNO’s network and construction of a new 132/11kV substation and a Data Centre.