Project Brief
The client requested the design, construction, and commissioning of a 20MVA Battery Energy Storage System (BESS) compound
Key Project Deliverables
- Works included detailed design and approvals
- Installation of civil and electrical infrastructure such as plinths for 11nr batteries and 6nr transformers, 700m of 33kV cabling, a 2-panel 33kV switchboard, auxiliary transformer, and fibre connections
- Temporary works were constructed to support a 300 ton crane that installed the 11nr batteries, each weighing 32 ton