project brief
The client required the design and delivery of a 20MVA 33kV DNO switchroom and cable route for a solar development in Staveley, Derbyshire
key project deliverables
- Supplied and installed a 33kV DNO switchroom including battery chargers and a metering room, along with 3.1km of 33kV cable duct installation, cable pulling, and jointing