Yearly Archives: 2018

JSM awarded ISO 27001 accreditation  

August 3rd, 2018

  JSM are proud to announce that we have been awarded with the ISO 27001 accreditation. ISO 27001 is an internationally acclaimed framework for information […]

Five million man hours without reporting a RIDDOR  

July 17th, 2018

  For the first time JSM have achieved five million man hours without a reportable injury under RIDDOR (Reporting of Injuries, Diseases and Dangerous Occurrences […]

Freedom Group – Virtus 66kV (Phase 3)  

July 16th, 2018

JSM will be continuing network reinforcement works for Freedom Power Group where they have requested for the installation of two new 66kV ducted cable circuits […]

JSM Group handed RoSPA Gold Award for health and safety practices  

April 27th, 2018

JSM Group has been handed a prestigious award in recognition of its practices and achievements in helping its staff/clients/contractors get home safely at the end […]

Freedom Group – Virtus 66kV cable installation  

March 29th, 2018

  JSM have been awarded upfront works to carry out a network reinforcement scheme where Freedom Power Solutions require the installation of 2 new 66kV […]

Freedom Group – Virtus 11kV cable installation  

January 15th, 2018

  Please be advised that JSM will be excavating a trench a trench for Electricity supply on behalf of Freedom in the public highway past […]

Considerate Contractor Streetworks Scheme Awards 2017  

January 2nd, 2018

JSM won the Gold Award at the 2017 City of London’s Considerate Contractor Streetworks Scheme Awards. This award was presented to JSM for the overall […]